Tuesday, November 15, 2016

Independent Inspection done! Fencing starts!!

Our independent inspector has inspected the property. The house wasn't clean, so it was difficult for him to inspect on a detail level. Specially cosmetic issues were harder to detect. However, the good thing is, there are no major issues found.

Another exciting news is: our landscaping starts from today. Our landscaper started with leveling the site to build retaining walls on one side. Fence should be up by this week giving us better security.
We are really happy that our SS allowed to install fences before handover. MJH only allowed this because of multiple vandalism attempts to the property.

They have fixed most major issues we reported on pre-PCI: Alarm and Video Intercom system have been installed, light temperature fixed, outdoor sensor light installed (though we are not sure about the sensitivity), Ensuite benchtop got replaced with Caesarstone Walnut, most walls got repainted, towel Rack got installed. However, there are still few blinds that need to be replaced, few areas are still in need of paint touch ups, toilet roll holder yet to be installed. But if these issues are mentioned in PCI list and promised to fix by the following week, we are still ready to accept the keys on day-after-tomorrow. Let's see how things progress, very excited and very anxious as well.

here are few photos: